Team Experience
- Installation of the first BIPV (Building Integrated PV) systems in Athens. Two different types of PV panels have been used in that project. More specifically, for the two sloping shelters, standards aluminium PV panels have been used, while on the building facades, in the glass curtain walls, translucent double glazing PV generators have been used. The system total installed capacity is 15 kWp. The installation was completed in 2003 and constituted the first system of the specific application in Greece.
- Installation of a Grid-connected system on a fixed support system of 300 kWp capacity (3x100 kWp) in Southern Greece. The installation was completed in July 2008.
- Installation of 3 Grid-connected systems (grid connected) in the Public Electric Power Authority of Cyprus, of a total capacity of 15 kWp.
- Design and installation of off-grid systems for telecommunication stations in different places in Greece (domestic use).